Installation and Debugging for Tee Machine

Installation for Tee Machine of Electrical control system cable use aviation plug, easy installation, you just need to connect them according to the mark number.
Hydraulic pipeline all have mark numbers in install image, connecting according to the mark number.


Debugging: When debugging, should first check the control system is normal or not, starting test to check each motor is normal start or not, each electromagnetic valve can work normally or not. After all above is, can adjust the main cylinder pressure to 4-5MPa, oil cylinder downward pressing at this time, equipment will have a certain gap, make some noise, keep pressure for a period time, oil cylinder lifting, fastening the lock net. Increase 2MPa for pressure, oil cylinder downward, pressure maintaining, upward, continue to fastening. Pressure gradually increase to 15-18MPa, fastening the lock net, weld the rib plate angle steel well.

After completion of Tee Machine installation, some stress is not eliminated, should have 3-4 months running-in period, during the running-in period do not overload use, using maximum pressure does not allow more than 20MPa. Equipment used during running-in period will release stress, if have some noise is belongs to normal phenomenon.


Know more knowledge about the installation and debugging for machines,contact us.Hei Yan supply Tee Machine,hot elbow machine,pipe bending machine,hydraulic press machine and so on.